On October 25th, 2007 demolition began on our property in
Boulder. A year-long process of designing, redesigning, redesigning and working
with the wrong "builder", then finally working with a fantastic architect and
selecting an experienced and professional builder has culminated in the
beginning of construction. We plan to post photos as we continue with the
process so keep watching!
|
|
|
|
|
|
Here is an old satellite photo (thanks DigitalGlobe!) of the property and house. |
|
|
|
|
|
|
|
|
|
|
|
Final pictures of the old house |
|
|
|
|
|
|
|
|
|
|
|
Another of the final pictures of the old house |
|
|
|
|
|
|
|
|
|
|
|
Demolition begins 10/25/07 |
|
|
|
|
|
|
|
|
|
|
|
There went the old garage |
|
|
|
|
|
|
|
|
|
|
|
|
|
A big hole in the ground is dug 10/29/07 |
|
|
|
|
|
|
|
|
|
|
|
The forms for the foundation were installed 11/6/07 |
|
|
|
|
|
|
|
|
|
|
|
The basement framing begins 12/19/07 |
|
|
|
|
|
|
|
|
|
|
|
And the foundation went in 12/20/07! We have basement walls! |
|
|
|
|
|
|
|
|
|
|
|
Thanks to snow, a lot of delays, but the in-floor heating is in! 2/20/08 |
|
|
|
|
|
|
|
|
|
|
|
2/27/08 and we have concrete poured for the basement floor |
|
|
|
|
|
|
|
|
|
|
|
|
3/5/08 even more lumber, I think this is a trend! |
|
|
|
|
|
|
|
|
|
|
|
The main floor is being built on 3/6/08 |
|
|
|
|
|
|
|
|
|
|
|
3/10/08 - Look at the framing, it goes up fast! |
|
|
|
|
|
|
|
|
|
|
|
And we have exterior walls on 3/11/08 |
|
|
|
|
|
|
|
|
|
|
|
|
The roof trusses! 3/18/08 |
|
|
|
|
|
|
|
|
|
|
|
3/18/08 Look at the roof forming! |
|
|
|
|
|
|
|
|
|
|
|
3/20/08 and it's looking like a house |
|
|
|
|
|
|
|
|
|
|
|
3/27/08 We have windows! This is the front of the house. |
|
|
|
|
|
|
|
|
|
|
|
3/28/08 - windows in the back of the house, love those eybrows! |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5/6/08 Our front entry - wow! |
|
|
|
|
|
|
|
|
|
|
|
|
5/22/08 - Stucco in progress |
|
|
|
|
|
|
|
|
|
|
|
5/22/08 - Stucco and roof shingles in progress |
|
|
|
|
|
|
|
|
|
|
|
Stucco in color as of 6/17/08 |
|
|
|
|
|
|
|
|
|
|
|
6/28/08 - The stone is installed! |
|
|
|
|
|
|
|
|
|
|
|
7/27/08 - Drywall is in! This is the front door and a view into the dining room. |
|
|
|
|
|
|
|
|
|
|
|
7/27/08 - More drywall - a view of the dining room and hallway from the front door |
|
|
|
|
|
|
|
|
|
|
|
9/3/08 - the kitchen floor - slate |
|
|
|
|
|
|
|
|
|
|
|
9/3/08 - the master bathtub (travertine) is taking shape |
|
|
|
|
|
|
|
|
|
|
|
9/3/08 - 2nd bathroom slate |
|
|
|
|
|
|
|
|
|
|
|
9/3/08 - Great room fireplace - WOW! |
|
|
|
|
|
|
|
|
|
|
|
10/3/08 - Our first outdoor light is hung |
|
|
|
|
|
|
|
|
|
|
|
10/30/08 - The wood floors are going in |
|
|
|
|
|
|
|
|
|
|
|
11/10/08 - Kitchen Granite (Black Galaxy) is installed |
|
|
|
|
|
|
|
|
|
|
|
11/10/08 - The walkway form (for the concrete) going in, you can see the bottom rounded step |
|
|
|
|
|
|
|
|
|
|
|
11/10/08 - Walkway in Progress |
|
|
|
|
|
|
|
|
|
|
|
11/12/08 - Concrete Porch |
|
|
|
|
|
|
|
|
|
|
|
11/16/08 - Stair Railings |
|
|
|
|
|
|
|
|
|
|
|
Many thanks to Waugh and Associates (architecture) and Mile
High Banks - we couldn't have done this without you!